商品情報にスキップ
1 2

Blanchard Importing and Distribution Co., Inc.

通常価格 ¥1,144 JPY
通常価格 セール価格 ¥1,144 JPY
セール 売り切れ
税込み。
書籍サイズ
ページ数

Illustration of the two main types of errors resulting from use of the economic order quantity (EOQ) as a tool in production scheduling. Designed to permit class discussion to begin with a consideration of one common type of mistake, errors in calculation of the EOQ volume resulting from use of incorrect data for the input parameters of the formula. The analysis can then shift to a more general discussion of the second type of error, the misapplication of EOQ and re-order point (ROP) techniques to a given system. Class discussion can conclude with student recommendations of alternative techniques which may be better suited to the Blanchard operation than the EOQ/ROP method.

【書誌情報】

ページ数:11ページ

サイズ:A4

商品番号:HBSP-673033

発行日:1972/9/1

登録日:2011/7/29

1 3